Giken ECO700S super crush piler with GRB system supplied to JN Piling at Chesham, Bucks

30 Oct 2013, 3:47 PM

200 metres of sheet pile wall has been installed alongside the Metropolitan line near Chesham, Buckinghamshire by JN Piling utilising a Giken ECO700S silent piler with super crush equipment.

The full Giken GRB system was utilised comprising 7 tons capacity clamp crane, power pack unit runner and pile runner as no access was available for any plant alongside the railway track.

An IHI CCH500T 50 tons telescopic crawler crane was positioned at the start of the pile line to service the pile runner and off load delivery vehicles. All of the equipment was supplied by us as the UK Giken dealer.

Pictured here showing the final pile being installed and the celebration that followed!

Giken super crush piler Chesham, Bucks

X Thank you for subscribing to the
AGD Equipment
mailing list.