AGD install tubular piles at night in Liverpool

29 Nov 2020, 6:53 PM

AGD love piling so much we even do it at night! Here we are in Liverpool installing 508 mm diameter tubes for SPI Piling on behalf of AE Yates Ltd. We first pre auger using a dangle drill, then handle pitch and drive the tubular piles with an SMS SG80 side grip vibro. Finally we drive the piles to the required set with our Fundex CPE15 impact hammer. All in a nights work for our operators.

Click on the link below to see a video of the machine with vibro in action.

X Thank you for subscribing to the
AGD Equipment
mailing list.