Marchetti Lupa servicing CFA rigs for SB3 on HS2

14 Jul 2023, 1:33 PM
Marchetti Lupa 65 tons telescopic crawler crane on hire on HS2 site Birmingham

One of our Marchetti Lupa, 65 tons telescopic crawler cranes supplied as a service crane to assist with placing reinforcement cages into CFA piles for SB3 the JV between Soletanche Bachy and Balfour Beatty Ground Engineering working for BBV on the HS2 project to the west of Birmingham.

The machine is equipped with a tier 5 engine therefore keeping emissions down to a minimum which is an important feature on HS2 sites.

It was on site for a total of 12 weeks along with an experienced, fully trained and directly employed operator.