TeamOrange install foundations for Another Place in Liverpool

13 Jun 2021, 4:19 PM
SMS SGM80 side grip installing tubular piles

We're at Another Place, Crosby Beach in Liverpool installing 355 mm diameter tubular piles as foundations for 100 statues commissioned by Sir Antony Gormley.

The statues all had to be in line with the horizon so it involved digging as well as piling. We had to work with the tides but it is all in a days work for our Hyundai HX330L excavator with #SMS SGM80 #SideGrip vibro and experienced operators and banksmen. Go #TeamOrange

Click on the link to see a drone video of the machine in action.

X Thank you for subscribing to the
AGD Equipment
mailing list.